<< 点击显示目录 >> 主页
mappVision帮助助手 > 机器视觉帮助 > mapp Vision > 诊断 > 状态编号 > 运行时信息的状态编号 -2118909912: Camera system version check is delayed due to a still active internal job on the camera. |
由于摄像机的内部任务仍在进行中,摄像机系统版本检查被延迟。
不能保证作业已成功完成。
在内部任务仍处于活动状态时重启了 PLC。
在重新启动 PLC 之前(由于热重启、冷重启、服务启动或任何类型的关机/重启),请确保当时
- 没有将视觉应用程序加载到摄像机、
- 没有将视觉应用程序保存到 PLC、
- 未执行摄像机系统版本检查
- 没有激活 mapp Vision 库的功能块。
是否正在检查摄像机系统版本以及是否正在加载视觉应用程序,可通过检查该摄像机的 I/O Datapoint CameraStatus 来验证。
保存 Visiona 应用程序过程的开始和结束都会在日志中记录。
警告
Camera system version check is delayed due to a still active internal job on the camera.
It is not garanteed that the job finished successfully.
The PLC was rebooted while an internal job was still active.
Before carrying out a reboot of the PLC (due to a Warm Restart, Cold Restart, Service Boot , any kind of shutdown / restart in general) make sure that at that time:
- no Vision Application is being loaded to a camera,
- no Vision Application is being saved to the PLC,
- no camera system version check is being performed,
- no function block of a mapp Vision library is being active.
Whether a camera system version is being checked or not and whether a Vision Application is being loaded or not, can be verified by checking the I/O Datapoint CameraStatus of that camera.
The start and finish of the process of saving a Visiona Application is entered with concatenated logbook entries.
Warning